Communicate with Supplier? Supplier
kyle Mr. kyle
What can I do for you?
Chat Now Contact Supplier

Sourcing Origin Co.,Ltd.

Service The World With Heart And Innovation

Send Inquiry

Your message must be between 20-8000 characters
3C Factory Inspection Requirements

3C Factory Inspection Requirements

Contact Now

Product Description

3C Factory Inspection content and requirements
3C factory inspection content:
1. The product certificate and the CCC mark, manufacturer, address, product name, model and specification of the molded/printed product on the packaging shall be consistent with the provisions of the product standard and the molding/printing record;
2. The CCC mark, manufacturer, product name, model and specifications of the product body molding/printing shall be consistent with the provisions of the product standard and the molding/printing;


2345_image_file_copy_40

3C factory inspection requirements
1. 3C Certification factory quality assurance capability review
The facility shall establish and maintain documented procedures to effectively control the documents and materials required by this document. These controls should ensure that:
1). Before the document is published and the changes should be approved by the licensor to ensure its suitability;
2). The status of the changes and revisions of the documents are identified to prevent unintended use of the obsolete documents;

3). Make sure that a valid version of the file is available at the point of use.


2. 3C certified product consistency
The factory shall control the consistency of the mass-produced products and the type-tested products to ensure that the certified products continue to meet the specified requirements.
The factory shall establish the change control procedures for the key components, materials, structures, etc. that affect the product's compliance with the specified requirements. The change of the certified product (which may affect the conformity with the relevant standards or the consistency of the type test prototype) shall be certified before implementation. It can be executed after the institution declares and obtains approval.
(1) The identity of the certified product and the consistency indicated in the type test report;
(2) The conformity of the structure of the certified product with the type test sample;
(3) The consistency of the important parts/components in the important parts/components of the certified product and the type test report;
(4) Conduct on-site inspections in accordance with the "Regular Inspection Items and Confirmation Inspection Items Table".
It is necessary to emphasize that the product consistency check is the focus of the 3C factory inspection and is the "high-voltage line". If there is a problem with the product consistency check, it will often lead to the failure of the factory.



2345_image_file_copy_42


3C factory inspection method
(1) The 3C initial factory inspection can be carried out separately or in combination with supervision and inspection.
(2) When all certified products are discontinued, the 3C certification body will not conduct factory inspection, and the 3C certification body will suspend all certificates of the factory. The factory shall inform the certification body of the production plan for the 3C certification body to arrange inspection and sample collection (when required), and the 3C certification body will restore the certificate when the factory inspection passes and the sample is qualified.
(3) The initial factory inspection of 3C is generally one day for two auditors. The supervision and inspection are generally conducted by two auditors for half a day. Of course, sometimes it is necessary to review the day and see the specific situation.
(4) Factory inspection includes both document inspection and on-site inspection. There are divisions between the two auditors, one is biased towards document inspection, and the other is biased towards on-site inspection.
(5) When the 3C certification body conducts normal supervision tasks, it shall confirm the date of supervision with the factory. The factory shall be responsible for confirming that the production is carried out normally during the supervision and that there are certified products. If the factory is in the factory, the certified products are not produced. When there is no stock, the 3C certification body does not conduct factory inspection, and the 3C certification body suspends the certificate of the factory. The factory shall notify the 3C certification body of the production plan so that the 3C certification body arranges inspections and samples (if necessary).When the factory inspection passes and the samples pass, the 3C certification body restores the certificate.

2345_image_file_copy_44

3C factory inspection time required
In principle, the 3C factory inspection time is completed within one year after the type test is passed, sometimes at the same time.
The scope of the inspection is the scope of the application for certification and the place where the certified product is produced. The contents of the inspection generally check the quality assurance capability of the factory and the consistency of the product. The number of inspections is generally 1-4 persons/day.


2345_image_file_copy_49


Looking for ideal Ccc Regulations Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Ccc Certification Requirements are quality guaranteed. We are China Origin Factory of Ccc Approval. If you have any question, please feel free to contact us.

Product Categories : Product Certification > 3C Factory Inspection

Email to this supplier

Your message must be between 20-8000 characters

Related Services List